Public consultation for PUZ – LIFTING OF EXISTING BUILDING RESTRICTIONS WITH A VIEW TO URBAN RESTRUCTURING IN THE AREA OF PLOIEȘTI, BOUNDED BY STADIONULUI STREET, THE SECTION BETWEEN POȘTEI STREET (INCLUDING THE BUILDING OF THE COMMUNITY SOCIAL SERVICES ADMINISTRATION) AND LATINĂ STREET (Studied area=20,705 sqm), initiation phase – between 02.04.2026 – 17.04.2026
BENEFICIARY: MUNICIPIUL PLOIEȘTI (Municipality of Ploiești)
LOCATION: Ploiești, str. Stadionului no. 1, 1B, 2, 1A, 3, 3A, 4, 5, 7, 14, 16, 18, 20, str. Latină no. 1, 2, 3, 4, partially no. 14, str. Poștei no. 4A, 6, 8, 10, 12, str. Meridiane no. 5, str. Latină, partial str. Stadionului, partial DJ 139 (Section between DJ 102E-str. Ștefan Greceanu, str. Stadionului)
PREPARED BY: S.C. BIG STUDIO – ARH DESIGN S.R.L. – ARCH. BOGDAN FLORIN GEORGESCU, R.U.R. certified.